|
|
INSTRUMENTS
and CONTROLS
BAE 3023
SPRING 2006
Homework Assignment #4
Department
of Biosystems and Agricultural Engineering
Oklahoma
State University
Stillwater,
OK 74078
Phone: (405) 744-4337
Fax: (405) 744-6059
EMAIL: mstone@okstate.edu
Use the Thomas Co simulator (http://www.chem.mtu.edu/~tbco/cm416/pidchoice.html)
to tune a PID controller for System A and System B in the simulator.
Find the values for P, I and D settings for
1. Field method
2. Quarter decay model method
3. IAE method.
Determine the time required to settle within 5% of a setpoint change of 0.5.
Complete this task for system A and for system B for each of the methods.
Plot the resulting response in Excel and include the optimum
settings and time on each plot. Turn in
both plots.
Complete this assignment by March 31, 2006.